Regal Building Products

Commercial

Shower wall panels for hotels and hospitality

In a hotel, the expensive part of a bathroom renovation is the room being out of service. A porcelain panel system that mounts mechanically gets rooms back in inventory faster than a tiled surround. When a valve fails two years later, the wall comes apart for the repair — it doesn't get demolished.

Rooms back in service sooner

Touchstone™ is real 6mm porcelain on a patented mechanical track. A tiled surround is built in the field across several wet trades, and each one has to finish before the next can start. A panel surround is assembled dry.

  • A shower surround installs in about a day
  • No thinset or grout, so nothing has to cure before the next trade
  • One installer working dry, instead of several wet trades in sequence
  • The same kit and the same sequence in every room

Across a floor or a property, that adds up. Every room runs the same kit and the same sequence, so the result doesn't depend on which crew showed up that day.

The wall comes apart when the plumbing fails

Plumbing fails eventually. Behind a tiled shower, a mixing valve, a supply line, or a diverter means breaking the wall out and rebuilding it: demolition, waterproofing, setting, grout, and a room out of inventory for days.

Because Touchstone panels attach mechanically instead of getting bonded in thinset, they come off to reach the cavity, then go back on. The repair is a plumbing job, not a wall rebuild.

Anchoring in metal stud construction

Most commercial bath walls are metal stud, which is the first question a general contractor asks. In metal stud framing, 3/4" plywood or OSB blocking is added between the studs to give the track system a solid anchor point.

Additional blocking goes behind that where accessories are planned — seats, grab bars, and anything else that has to carry load. Those locations need to be set during framing, before the panels go on. The full assembly is documented in the CSI specification.

Specifying it

Commercial projects route through our distributors.

Touchstone ships Q3 2026. Specifiers and property teams reach us through our factory relationships. From there, the project routes to the distributor covering that market, with factory-trained installers and a manufacturer-backed warranty behind the kit.

Every kit carries 3 years of commercial coverage out of the box. Installs completed by a Factory Trained Installer to the full Pro spec, and registered within 30 days, carry 15 years. Read the warranty.

Common questions

A full shower surround installs in about a day. The panels mount mechanically to the framing, so there's no thinset or grout, and no waiting on wet trades to cure. The crew sets the schedule, not the drying time.

Yes. Because the panels attach mechanically instead of being set in thinset, they can be removed to reach the wall cavity, then reinstalled. A valve or supply repair behind a tiled surround usually means demolishing the wall and rebuilding it.

In metal stud buildings, 3/4" plywood or OSB blocking is added between the studs to give the panel system a solid anchor point. Additional blocking can be added behind that to carry accessories such as seats and grab bars.

Yes, where blocking has been placed for them. Accessory locations need to be set during framing, before the panels go on. Load and code requirements are a project-specific question for the design team.

It is real fired porcelain rather than a molded plastic or a gel-coated resin, in large-format panels with no grout lines. See how it compares to acrylic inserts and cultured marble.

Commercial projects route through our distributor network. Touchstone ships Q3 2026 — find a distributor to start a project conversation, or pull the CSI specification for a project manual.